Saturday, May 16, 2009
Loads up to 16,400 ft
Dave called tonight from Camp 3 after carrying loads up to the ridge at around 16,400ft. They are doing great, and taking advantage of the improving weather and moving right along. They'll plan on one last day of acclimitization at camp 3 and then they'll be ready to move up to high camp.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment